Flash Suppressor 2" (f)
Order item
Estimated delivery time is 1 week(s)
Installed on the tank’s vent pipe. Should be checked once a year. Depending on the zone, local regulations may require installation on all tanks containing flammable substances.
Technical data
- Part No
- 29150
- H.S. Code
- 84212980